Commercial Facility Dharan Project

Name of the Owner : KHALIFA A. ALMULHEM Holding Company

Main Contractor : KAMCO

Our Provided Services : EPC

Value : 100,000,000 SAR

S.No Phase Description
1 Early Site Works & Utilities Execute all initial site preparation, including clearing, grubbing, demolition (if required),
mass grading, erosion control, and installation of temporary and permanent underground utilities
(water, sewer, storm drainage, electrical, and communication infrastructure).
2 Foundation & Substructure Complete all deep and shallow foundation work, including excavation, dewatering, construction
of footings, foundation walls, and the ground-level slab-on-grade for the entire structure.
3 Superstructure & Decking Erect the primary structural frame of the building, including all vertical elements (columns)
and horizontal elements (beams, girders, and floor/roof decking) using the specified materials
(e.g., structural steel or reinforced concrete).
4 Building Envelope & Roofing Construct the complete exterior enclosure, including installation of exterior wall systems
(e.g., curtain wall, masonry), all glazing, exterior doors, and the full roofing system to
achieve a weather-tight structure.
5 MEP/FP Rough-in & Distribution Install all major Mechanical, Electrical, Plumbing, and Fire Protection (MEP/FP) systems,
including the rough-in of ductwork, piping, conduit, fire suppression lines, and primary
distribution equipment throughout the building.
6 Interior Framing & Drywall Execute all interior framing for tenant spaces and common areas, including metal stud walls,
bulkheads, and soffits, followed by the installation and finishing of drywall and fire-rated assemblies.
7 Common Area Finishes & Vertical Transport Complete all architectural finishes in the mall’s common areas (corridors, atriums, restrooms),
including flooring, wall finishes, ceilings, lighting fixtures, and the installation and
commissioning of elevators and escalators.
8 Site Development & Landscaping Finalize all exterior site work, including paving of parking lots and access roads, installation
of site lighting, signage, hardscaping (walkways, plazas), and execution of the final soft landscaping plan.
9 System Commissioning & Testing Perform comprehensive testing, balancing, and commissioning of all building systems (HVAC,
electrical, life safety, security, and building automation) to ensure full operational compliance
with design specifications and regulatory requirements.
10 Final Inspection & Handover Obtain all necessary final inspections, occupancy permits, and regulatory approvals, compile
all close-out documentation (as-builts, O&M manuals, warranties), and formally hand over
the fully operational facility to the owner.