Petro-Rabigh II Building Works (B4)
Name of the Owner : SAUDI ARAMCO
Main Contractor : GS Engineering Construction Co.
Our Provided Services : PC
Value : 112,000,000 SAR
Scope of Work
- Construction of 7 Nos. of Substation Buildings, CCR Building, Process Interface Building, Operation Tower, and other associated structures on a turnkey basis
-
Scope Includes:
- Complete civil, mechanical, and electrical works
-
Civil and Structural Works:
- Earthworks
- Foundations
- Concrete works
- Backfilling
- Structural framing
-
Architectural Finishing:
- Blockwork
- Plastering
- Painting
- Tiling
- Doors and windows installation
- Roofing
-
Mechanical Works:
- HVAC systems
- Piping
- Plumbing
- Firefighting systems
- Equipment installation
-
Electrical and Instrumentation (E&I) Works:
- Power distribution
- Cable laying
- Panel installation
- Lighting systems
- Instrumentation
- Grounding
- Testing & commissioning
-
External and Infrastructure Works:
- Asphalt works
- Curbstone installation
- Interlock paving
- Drainage systems
- Road works
- Fencing
- Site development